Your electricity bill?
Let's make it ₹0.
ବିଜୁଳି ବିଲ ₹0 କରିବୁ।
₹1,38,000 ସବସିଡି ଆଣିଦେବୁ।
PM Surya Ghar gives ₹1,38,000 in combined
Central + State subsidy on a 3 kW home system — and we handle every form, every approval,
every DISCOM visit. Installed by Odisha's trusted local team since 2013.
Odisha homeowners qualify for both the Central PM Surya Ghar subsidy and an additional
Odisha State grant — combined, the largest residential solar incentive in India.
Central subsidy under PM Surya Ghar: Muft Bijli Yojana — ₹30,000/kW for the first 2 kW, ₹18,000 for the 3rd kW, capped at ₹78,000. Odisha State Financial Assistance (Cabinet approved Jan 2025) — additional ₹25,000/kW for first 2 kW, ₹10,000 for 3rd kW. Subsidies apply only to grid-connected residential systems with net metering, installed through a PMSGY-empaneled vendor. We are that vendor.
3 kW example
3 kW ଉଦାହରଣ
Gross system costମୋଟ ଖର୍ଚ₹2,10,000
Less: both subsidiesସବସିଡି ବାଦ−₹1,38,000
Your out-of-pocketଆପଣଙ୍କ ଖର୍ଚ~₹72,000
Recovered in around 2 years through electricity bill savings.
ବିଜୁଳି ବଚତ ଦ୍ୱାରା 2 ବର୍ଷ ମଧ୍ୟରେ ଫେରତ।
We handle the full subsidy paperwork — PMSGY registration, DISCOM net-meter approval,
claim filing, and assistance in direct-to-bank disbursal. You sign three forms; we do the rest.
Odisha gets 300 sunny days a year.ଓଡ଼ିଶା ବର୍ଷକୁ 300 ଦିନ ରୋଦ ପାଏ।
With 4.5–6.0 peak sun hours daily and a state subsidy no other state matches, Odisha is
one of India's best places to go solar — not just environmentally, but financially.
We are PMSGY-empaneled — a legal prerequisite to process PM Surya Ghar subsidies. Many installers in Odisha are not. Always verify empanelment before signing.
"M-Lite handled everything — from survey to the subsidy money landing in my account. I had no idea it would be this smooth. My electricity bill has gone from ₹2,800 to almost zero."
"The team is very professional. They explained every step in Odia, which I appreciated. The 3 kW system generates more than I expected even in overcast months."
"I was worried about the subsidy paperwork but M-Lite took care of it entirely. The combined ₹1,38,000 came directly to my bank account within 45 days of commissioning."
As a government-approved contractor and OREDA-empanelled supplier, M-Lite executes public-sector
energy and water infrastructure across Odisha — solar street lights, community water systems,
rural electrification, and drinking water for schools.
Estimates use Odisha residential tariff ₹6/unit and system generation of 4 kWh/kW/day.
Actual results vary. Subsidies apply to on-grid residential only.
FREQUENTLY ASKED
ବାରମ୍ବାର ପ୍ରଶ୍ନ
Questions we hear every day
ଆମ ଗ୍ରାହକ ପ୍ରତ୍ୟେକ ଦିନ ପଚାରନ୍ତି
Any Indian residential household with a sanctioned grid connection can apply. There is no income cap, but the subsidy is limited to one system per household. Commercial and industrial installations are not eligible for residential subsidies.
The Central PM Surya Ghar subsidy (₹30,000/kW for first 2 kW, ₹18,000 for 3rd kW, capped at ₹78,000) is from the Government of India. The Odisha State Financial Assistance (Cabinet approved January 2025, ₹25,000/kW for first 2 kW, ₹10,000 for 3rd kW, capped at ₹60,000) is an additional grant from the Odisha government. Both are credited directly to your bank account.
Yes — the full system cost is paid upfront, and subsidies are credited to your account after commissioning (typically 30–60 days). We can help you connect with bank financing at preferential rates through our empaneled bank partners.
Typically 4–8 weeks: 1 week for design and DISCOM application, 3–5 weeks for DISCOM approval, 2–3 days for physical installation, and 1 week for net meter commissioning. DISCOM timelines vary by district.
Under Odisha's net metering policy, surplus units are exported to the grid and credited to your account at the applicable feed-in tariff. Credits roll over monthly and settle annually — good months offset weaker ones.
Panels carry a 25-year linear performance warranty (minimum 80% output at year 25) and a 10-year product warranty. Inverters carry a 5-year manufacturer warranty. M-Lite adds a 24-month workmanship warranty on all installations.
Standard on-grid systems shut down during grid outages — this is a mandatory safety regulation. If backup power matters to you, ask about our hybrid systems with battery storage, available from 2 kW upward.
Yes. On-grid and hybrid systems can be expanded within your DISCOM-approved capacity. We design every system with future expansion in mind and document the available headroom in your handover file.
Start with a free site survey.
ମାଗଣା ଛାତ ସର୍ଭେ ଦିଅ।
Our engineer visits your property, assesses your roof and load, and gives you a written
system recommendation — at no cost, no obligation.